Passwords are now in effect! If you are not able to log in with the default password, click “reset password.”

Quail Mountain Ski Area prelimary financial feasibility study, April 1986
(Book)

Book Cover
Average Rating
Published:
Leadville, CO : The Associates, 1986.
Physical Desc:
n 28 cm
Status:
Lake County Colorado Mnt History
CMHC 917.8846 QUA
Description

Establishes the preliminary financial feasibility of the project from an operations, market and investor expectation standpoint, prior to the detailed study scheduled to take place in the master planning process.

Also in This Series
Copies
Location
Call Number
Status
Lake County Colorado Mnt History
CMHC 917.8846 QUA
On Shelf
More Like This
More Copies In Prospector
Loading Prospector Copies...
More Details
Format:
Book
Language:
English

Notes

Description
Establishes the preliminary financial feasibility of the project from an operations, market and investor expectation standpoint, prior to the detailed study scheduled to take place in the master planning process.
Local note
Lake County -- Duplicate copy in Storage.
Local note
Lake County -- Colorado Moutain History Collection does not circulate.
Tagging
Tags:

No Tags, Be the first to tag this record!


Citations
APA Citation (style guide)

Twin Lakes Associates, I. (1986). Quail Mountain Ski Area prelimary financial feasibility study, April 1986. Leadville, CO, The Associates.

Chicago / Turabian - Author Date Citation (style guide)

Twin Lakes Associates, Inc. 1986. Quail Mountain Ski Area Prelimary Financial Feasibility Study, April 1986. Leadville, CO, The Associates.

Chicago / Turabian - Humanities Citation (style guide)

Twin Lakes Associates, Inc, Quail Mountain Ski Area Prelimary Financial Feasibility Study, April 1986. Leadville, CO, The Associates, 1986.

MLA Citation (style guide)

Twin Lakes Associates, Inc. Quail Mountain Ski Area Prelimary Financial Feasibility Study, April 1986. Leadville, CO, The Associates, 1986.

Note! Citation formats are based on standards as of July 2022. Citations contain only title, author, edition, publisher, and year published. Citations should be used as a guideline and should be double checked for accuracy.
Staff View
Grouped Work ID:
ab662e50-eb65-7fd5-c4dc-a551b26f045e
Go To GroupedWork

Record Information

Last Sierra Extract TimeApr 13, 2024 06:55:42 PM
Last File Modification TimeApr 13, 2024 06:56:02 PM
Last Grouped Work Modification TimeApr 13, 2024 06:55:48 PM

MARC Record

LEADER01681nam a2200373zu 4500
00520110831120704.0
007ta
008101216s1986    USAbd  er ~~~ 000 0 eng~d
035 |a (LCPL)201090581
040 |a LCPL|b eng|c LCPL
092 |a CMHC 917.8846 QUA
1102 |a Twin Lakes Associates, Inc.
24510|a Quail Mountain Ski Area prelimary financial feasibility study, April 1986 /|c prepared by Twin Lakes Associates, Inc.
264 1|a Leadville, CO :|b The Associates,|c 1986.
300 |c 28 cm|a n
336 |a text|b txt|2 rdacontent
337 |a unmediated|b n|2 rdamedia
338 |a volume|b nc|2 rdacarrier
520 |a Establishes the preliminary financial feasibility of the project from an operations, market and investor expectation standpoint, prior to the detailed study scheduled to take place in the master planning process.
590 |a Lake County -- Duplicate copy in Storage.
590 |a Lake County -- Colorado Moutain History Collection does not circulate.
650 4|a Quail Mountain Ski Area.
650 0|a Ecology|0 https://id.loc.gov/authorities/subjects/sh85040752|z Colorado.|0 https://id.loc.gov/authorities/names/n80125532-781
901 |a 3911300067056+
907 |a .b58306390
948 |a MARCIVE Overnight, in 2023.01
948 |a MARCIVE Comp, 06/2022
948 |a MARCIVE Q3&4 2018
989 |1 .i121339877|b 3911300067057%|d lccmh|g -|m |h 0|x 0|t 0|i 0|j 78|k 181028|o -|a CMHC 917.8846 QUA
995 |a Loaded with m2btab.ltiac in 2023.01
995 |a Loaded with m2btab.ltiac in 2022.06
995 |a Loaded with m2btab.ltiac in 2019.01
995 |a Initial Lake County load m2btab.test019 in 2018.10
998 |e -|f eng|a lc